2022 Sportsman 352 "Change Order"

2022 Sportsman 352 "Change Order"

Lantana, Florida

Length 35'

Beam 11' 2"

Draft 2'

Price $ 329,000

Length 35'

Beam 11' 2"

Draft 2'

Lantana, Florida

2022 Sportsman 352 "Change Order"

Summary

For Sale: 2022 Sportsman 352 Center Console – Twin Yamaha 425s Low Hours and Extended Warranty

This 2022 Sportsman 352 is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425s with digital electric steering. Built for serious performance and all-day comfort, it blends innovative tech, high-end finishes, and serious fishability.

Electronics & Helm:

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13” stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler

Comfort & Layout:

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty

This 35’ center console is turnkey and ready for anything—whether you’re heading offshore or entertaining at the sandbar. Loaded with features, meticulously kept, and built to perform. Extended engine warranty

Atlantic Yacht & Ship, Inc. is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

If you are looking at yachts for sale, thinking about selling your yacht or need service for your yacht, it is always wise to have an experienced broker from Atlantic Yacht and Ship to represent your interests.

Electronics & Helm:

  • Dual Garmin GPSMAP® 8622 MFD 22" displays
  • Yamaha Command Link Plus CL7 touchscreen
  • Garmin VHF 215 radio
  • SeaStar Maximus digital switching
  • Edson 13” stainless steel steering wheel w/ power knob
  • JL Audio M6 sound system w/ 12 speakers & dual MVi DSP amps
  • Fusion® Apollo™ stereo + remote
  • Airmar B175M CHIRP transducer

Fishing & Deck Features:

  • Dual 30-gallon pressurized aquarium livewells
  • Macerated in-deck fish boxes
  • 6 flush-mounted gunwale rod holders
  • Under-gunwale rod storage & bow storage
  • High-speed livewell pickup & sea chest
  • Dual side entry doors w/ removable boarding ladder
  • Rear insulated cooler, built-in 65 qt. lounge cooler

Comfort and Layout

  • Triple premium captain’s chairs at the helm
  • Rear-facing seat w/ sink
  • Console berth w/ sleeping for 2 adults + child, sink, shower, & porcelain head
  • Electric-actuated bow table/sun deck
  • Wraparound bow seating w/ removable backrests
  • Fiberglass hard-top with integrated lighting, tempered glass windshield & vent
  • Sileather® premium marine upholstery

Build & Utility:

  • 355-gallon fuel tank
  • 35-gallon freshwater tank w/ washdown
  • Raw water washdown
  • Trim tabs w/ LED indicators
  • Onboard battery charging system
  • Anchor windlass system w/ 400’ line
  • Total Access bilge compartment w/ Seakeeper pod
  • SportTech® vacuum infusion hull construction
  • 10-year hull warranty

Listing MLS by Yachtr.com